Customization: | Available |
---|---|
After-sales Service: | Online Support |
Warranty: | 1 Year |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() |
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Machine description of the Garri processing line
Garri processing line, the first step is to clean and peel the cassava, then put the cassava into the crusher and crush it into pulp. The cassava pulp can be fermented in a bucket for two or three days to make the cassava residue in the fermentation process. Produce some beneficial bacteria that are good for your health. The cassava residue needs to be dehydrated by a hydraulic press dehydrator. The mill grinds the dehydrated garri into powder and then sieves it through a sieve. Finally, the garri powder can be directly processed package.
Machine application of the Cassava flour production line
Potatoes, sweet potatoes, cassava, tapioca, dried sweet potatoes, etc., and the root of kudzu vine, lily, yam, and other tuber plants.
1) The whole machine is made of stainless steel with high safety.
2) This machine can be customized according to your needs.
3) Continuous, high output, high automation, can match with the large production line.
Model |
Diameter(mm) |
Depth(mm) |
Stirring Power(kW) |
Capacity (kg/h) |
GF-300 |
1000 |
390 |
1.5 |
40 |
GF-400 |
1000 |
420 |
1.5 |
60 |
GF-500 |
1000 |
450 |
1.5 |
100 |
GF-600 |
1000 |
450 |
3 |
150 |
1. Are you a manufacturer?
Yes, we are. Welcome to visit our factory.
2. Can you change the machine voltage as per our request?
Yes, we can.
3. How about your after-sales service?
Our engineer can go outside to install and train your workers to operate the full machine line.
4. Warranty time of your machine?
1 year except for consumable spare parts.
5. How about the delivery time of your machine?
Generally, it needs 5-7 days for big machines or producing line, and it will be much longer but within our negotiated delivery time.